Design for SkySong 6 Unveiled as Building Enters Pre-Leasing

Office leasing momentum remains strong at SkySong – so much so that the project’s sixth building has now been designed and launched for pre-leasing.

SkySong 6 will be the next building to be constructed at SkySong. Project architects, Butler Design, Group have created cutting-edge design concepts and renderings for the new building, which will have an imposing presence at the hard corner of Scottsdale and McDowell Roads. A key differentiator of SkySong 6 will be 55,000 square foot floor plates – the largest floor plates built along Scottsdale Road in the past 20 years.

With SkySong 5, which is currently under construction and expected to open this summer, already achieving 73 percent occupancy, the time was right to begin thinking about the creation of even more Class A office space at the project.

“We are absolutely thrilled with the SkySong 5’s success and are already looking forward to preleasing on SkySong 6,” said Sharon Harper, President & CEO of Plaza Companies, the master developer of the project. “These two dynamic buildings really illustrate the vision of innovation and technology that makes SkySong so attractive to companies.”

Read the entire press release at this link.

Scroll to Top